|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: BOLIVAR (Supervisor District 2) DATE OF LAST INSPECTION.: 1123
[Supervisor District 1]
STRUCTURE NUMBER...: SA0600000000063
LOCATION...........: SEC 5 T21N R 7W
FACILITY CARRIED...: DITCH BANK ROAD
FEATURE INTERSECTED: CHRISTMAS LAKE BRANCH
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1973
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 30
BYPASS/DETOUR LENGTH.: 6 MI.
DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION
BRIDGE PROGRAM ELIGLBLITY: LSBP
BRIDGE POSTING...........: P - Posted for load
TANDEM AXLE (TONS).................. 15
|