This page created: 11/25/2024 07:22:46 AM                       Click here for Comprehensive Report

COUNTY: BOLIVAR   (Supervisor District 2)     DATE OF LAST INSPECTION.: 0124
                  [Supervisor District 5]
STRUCTURE NUMBER...: SA0600000000115
LOCATION...........: SEC 22 T22N R 6W B
FACILITY CARRIED...: YALE STREET       
FEATURE INTERSECTED: BCH OF WEST BOGUE HASTY  
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302

    STEEL STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 1994
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 40
BYPASS/DETOUR LENGTH.:  5 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 6 - SATISFACTORY CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  22
                           HS SHORT (TONS).....................  28
                           HS LONG (TONS)......................  36