|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: BOLIVAR (Supervisor District 4) DATE OF LAST INSPECTION.: 0224
[Supervisor District 3]
STRUCTURE NUMBER...: SA0600000000209
LOCATION...........: SEC 29 T24N R 6W
FACILITY CARRIED...: BULLOCK ROAD
FEATURE INTERSECTED: RELIEF FOR SNAKE CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1975
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 130
BYPASS/DETOUR LENGTH.: 5 MI.
DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 6 - SATISFACTORY CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 7 - GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: P - Posted for load
TANDEM AXLE (TONS).................. 12
|