This page created: 07/15/2024 07:13:18 AM                       Click here for Comprehensive Report

COUNTY: BOLIVAR   (Supervisor District 1)     DATE OF LAST INSPECTION.: 0324
                  [Supervisor District 1]
STRUCTURE NUMBER...: SA0600000000216
LOCATION...........: SEC 25 T24N R 7W  
FACILITY CARRIED...: PHALIA ROAD       
FEATURE INTERSECTED: BOGUE PHALIA CREEK       
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302

    STEEL STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 1997
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 10
BYPASS/DETOUR LENGTH.:  1 MI. 

DECK RATING..........: 3 - SERIOUS CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: LSBP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  13
                           HS SHORT (TONS).....................  16
                           HS LONG (TONS)......................  19