This page created: 11/25/2024 07:22:46 AM                       Click here for Comprehensive Report

COUNTY: BOLIVAR   (Supervisor District 5)     DATE OF LAST INSPECTION.: 0324
                  [Supervisor District 5]
STRUCTURE NUMBER...: SA0600000000244
LOCATION...........: SEC  2 T21N R 5W  
FACILITY CARRIED...: SUNRISE DRIVE     
FEATURE INTERSECTED: BCH OF LEAD BAYOU        
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302

    STEEL STRINGER/MULTI-BEAM OR GIRDER

YEAR BUILT......................: 1997
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 40
BYPASS/DETOUR LENGTH.:  4 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 6 - SATISFACTORY CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  29
                           HS SHORT (TONS).....................  37