|
This page created: 11/25/2024 07:22:46 AM Click here for Comprehensive Report
COUNTY: BOLIVAR (Supervisor District 2) DATE OF LAST INSPECTION.: 0224
[Supervisor District 2]
STRUCTURE NUMBER...: SA060000000A107
LOCATION...........: SEC 12 T22N R 6W
FACILITY CARRIED...: MORRISON CHAPEL RD
FEATURE INTERSECTED: EAST BOGUE HASTY
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 2022
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 160
BYPASS/DETOUR LENGTH.: 2 MI.
DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|