This page created: 11/18/2024 07:17:17 AM                       Click here for Comprehensive Report

COUNTY: CALHOUN   (Supervisor District 3)     DATE OF LAST INSPECTION.: 0423
                  [Supervisor District 3]
STRUCTURE NUMBER...: SA070000000A020
LOCATION...........: SEC 32 T11S R 2W  
FACILITY CARRIED...: CR 282            
FEATURE INTERSECTED: SPRING CREEK             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119

    CONCRETE BOX BRIDGE

YEAR BUILT......................: 2018
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 50
BYPASS/DETOUR LENGTH.:  7 MI. 

DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 8 - VERY GOOD CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS