This page created: 12/16/2024 07:28:00 AM                       Click here for Comprehensive Report

COUNTY: CARROLL   (Supervisor District 3)     DATE OF LAST INSPECTION.: 1024
                  [Supervisor District 3]
STRUCTURE NUMBER...: SA0800000000010
LOCATION...........: SEC 13 T17N R 1E  
FACILITY CARRIED...: CO RD 75          
FEATURE INTERSECTED: ABIACA CREEK             
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1977
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 60
BYPASS/DETOUR LENGTH.: 15 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 3 - SERIOUS CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: LSBP

BRIDGE POSTING...........: P - Posted for load
                            
                           RECOMMENDED TO BE CLOSED 
                           H TRUCK (TONS)......................  15
                           HS SHORT (TONS).....................  22
                           HS LONG (TONS)......................  22