|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: CARROLL (Supervisor District 3) DATE OF LAST INSPECTION.: 1022
[Supervisor District 3]
STRUCTURE NUMBER...: SA0800000000010
LOCATION...........: SEC 13 T17N R 1E
FACILITY CARRIED...: CO RD 75
FEATURE INTERSECTED: ABIACA CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1977
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 60
BYPASS/DETOUR LENGTH.: 15 MI.
DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 3 - SERIOUS CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY: LSBP
BRIDGE POSTING...........: P - Posted for load
RECOMMENDED TO BE CLOSED
H TRUCK (TONS)...................... 15
HS SHORT (TONS)..................... 22
HS LONG (TONS)...................... 22
|