This page created: 08/12/2024 07:22:40 AM                       Click here for Comprehensive Report

COUNTY: HARRISON   (Biloxi)                   DATE OF LAST INSPECTION.: 1023
                   [Supervisor District 5]
STRUCTURE NUMBER...: SA2400000000053
LOCATION...........: SEC 35 T 6S R10W B
FACILITY CARRIED...: WOOLMARKET RD     
FEATURE INTERSECTED: PARKER CREEK             
BRIDGE OWNER.......: 04 - CITY OR MUNICIPAL HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1964
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 4,000
BYPASS/DETOUR LENGTH.:  6 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 3 - SERIOUS CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................   9
                           HS SHORT (TONS).....................  13
                           HS LONG (TONS)......................  15