|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: HINDS (Clinton) DATE OF LAST INSPECTION.: 0124
[Supervisor District 1]
STRUCTURE NUMBER...: SA2500000000195
LOCATION...........: SEC 4 T 6N R 1W B
FACILITY CARRIED...: PINEHAVEN DR
FEATURE INTERSECTED: BOGUE CHITTO CREEK
BRIDGE OWNER.......: 04 - CITY OR MUNICIPAL HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1959
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 3,700
BYPASS/DETOUR LENGTH.: 4 MI.
DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION
BRIDGE PROGRAM ELIGLBLITY: SABP
BRIDGE POSTING...........: P - Posted for load
GROSS (TONS).............. 3
|