This page created: 11/18/2024 07:17:17 AM                       Click here for Comprehensive Report

COUNTY: HINDS   (Clinton)                     DATE OF LAST INSPECTION.: 0124
                [Supervisor District 1]
STRUCTURE NUMBER...: SA2500000000195
LOCATION...........: SEC  4 T 6N R 1W B
FACILITY CARRIED...: PINEHAVEN DR      
FEATURE INTERSECTED: BOGUE CHITTO CREEK       
BRIDGE OWNER.......: 04 - CITY OR MUNICIPAL HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1959
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 3,700
BYPASS/DETOUR LENGTH.:  4 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           GROSS (TONS)..............   3