|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: HINDS (Jackson) DATE OF LAST INSPECTION.: 1023
[Supervisor District 2]
STRUCTURE NUMBER...: SA2500000000409
LOCATION...........: SEC 14 T 6N R 1W
FACILITY CARRIED...: FLAG CHAPEL ROAD
FEATURE INTERSECTED: BOGUE CHITTO CREEK
BRIDGE OWNER.......: 04 - CITY OR MUNICIPAL HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1976
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 5,000
BYPASS/DETOUR LENGTH.: 3 MI.
DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 4 - POOR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: P - Posted for load
TANDEM AXLE (TONS).................. 12
|