|
This page created: 05/10/2021 07:18:52 AM Click here for Comprehensive Report
COUNTY: LINCOLN (Supervisor District 4) DATE OF LAST INSPECTION.: 1020
STRUCTURE NUMBER...: SA4300000000103
LOCATION...........: SEC 10 T 6N R 7E
FACILITY CARRIED...: CHESTNUT LN SW
FEATURE INTERSECTED: TRIB BOGUE CHITTO RIVER
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1989
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 50
BYPASS/DETOUR LENGTH.: 2 MI.
DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 2 - CRITICAL CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION
SUFFICIENCY RATING.......: 39.0
ELIGLBLE FOR LSBP FUNDS..: YES
BRIDGE POSTING...........: K - Bridge closed to all traffic
|