|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: LINCOLN (Supervisor District 4) DATE OF LAST INSPECTION.: 0224
[Supervisor District 4]
STRUCTURE NUMBER...: SA430000000A103
LOCATION...........: SEC 10 T 6N R 7E
FACILITY CARRIED...: CHESTNUT LN SW
FEATURE INTERSECTED: TRIB BOGUE CHITTO RIVER
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 2021
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 100
BYPASS/DETOUR LENGTH.: 2 MI.
DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|