This page created: 11/18/2024 07:17:17 AM                       Click here for Comprehensive Report

COUNTY: LINCOLN   (Supervisor District 4)     DATE OF LAST INSPECTION.: 0224
                  [Supervisor District 4]
STRUCTURE NUMBER...: SA430000000A103
LOCATION...........: SEC 10 T 6N R 7E  
FACILITY CARRIED...: CHESTNUT LN SW    
FEATURE INTERSECTED: TRIB BOGUE CHITTO RIVER  
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 2021
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 100
BYPASS/DETOUR LENGTH.:  2 MI. 

DECK RATING..........: 8 - VERY GOOD CONDITION
SUPERSTRUCTURE RATING: 8 - VERY GOOD CONDITION
SUBSTRUCTURE RATING..: 8 - VERY GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS