|
This page created: 12/16/2024 07:28:00 AM Click here for Comprehensive Report
COUNTY: LINCOLN (Supervisor District 5) DATE OF LAST INSPECTION.: 0123
[Supervisor District 3]
STRUCTURE NUMBER...: SA430000000A222
LOCATION...........: SEC 5 T 8N R 5E
FACILITY CARRIED...: HARVEY DR NW
FEATURE INTERSECTED: TRIB HOMOCHITTO RIVER
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119
CONCRETE BOX BRIDGE
YEAR BUILT......................: 2016
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 60
BYPASS/DETOUR LENGTH.: 3 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 7 - GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|