This page created: 11/18/2024 07:17:17 AM                       Click here for Comprehensive Report

COUNTY: LINCOLN   (Supervisor District 5)     DATE OF LAST INSPECTION.: 0123
                  [Supervisor District 3]
STRUCTURE NUMBER...: SA430000000A222
LOCATION...........: SEC  5 T 8N R 5E  
FACILITY CARRIED...: HARVEY DR NW      
FEATURE INTERSECTED: TRIB HOMOCHITTO RIVER    
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119

    CONCRETE BOX BRIDGE

YEAR BUILT......................: 2016
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 60
BYPASS/DETOUR LENGTH.:  3 MI. 

DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 7 - GOOD CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS