|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: NEWTON (Supervisor District 5) DATE OF LAST INSPECTION.: 1022
[Supervisor District 5]
STRUCTURE NUMBER...: SA5100000000022
LOCATION...........: SEC 6 T 5N R13E B
FACILITY CARRIED...: HICKORY-FELLOWSHIP
FEATURE INTERSECTED: POTTERCHITTO CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122
CONCRETE CHANNEL BEAM (PRECAST UNITS)
YEAR BUILT......................: 1975
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 460
BYPASS/DETOUR LENGTH.: 6 MI.
DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION
BRIDGE PROGRAM ELIGLBLITY: SABP
BRIDGE POSTING...........: P - Posted for load
H TRUCK (TONS)...................... 27
HS SHORT (TONS)..................... 32
HS LONG (TONS)...................... 39
|