This page created: 12/16/2024 07:28:00 AM                       Click here for Comprehensive Report

COUNTY: NEWTON   (Supervisor District 3)      DATE OF LAST INSPECTION.: 0924
                 [Supervisor District 3]
STRUCTURE NUMBER...: SA5100000000115
LOCATION...........: SEC  1 T 8N R10E B
FACILITY CARRIED...: PROSPECT-CEDAR LN 
FEATURE INTERSECTED: BCH OF SIPSEY CREEK      
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1974
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 200
BYPASS/DETOUR LENGTH.:  5 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 4 - POOR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  10
                           HS SHORT (TONS).....................  15
                           HS LONG (TONS)......................  16