|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: NOXUBEE (Supervisor District 4) DATE OF LAST INSPECTION.: 0223
[Supervisor District 4]
STRUCTURE NUMBER...: SA520000000A021
LOCATION...........: SEC 30 T13N R17E
FACILITY CARRIED...: DORROH HILL RD.
FEATURE INTERSECTED: SHUQUALAK CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119
CONCRETE BOX BRIDGE
YEAR BUILT......................: 2014
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 10
BYPASS/DETOUR LENGTH.: 25 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 5 - FAIR CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|