|
This page created: 03/31/2025 07:23:21 AM Click here for Comprehensive Report
COUNTY: PEARL RIVER (Supervisor District 2) DATE OF LAST INSPECTION.: 0423
[Supervisor District 2]
STRUCTURE NUMBER...: SA5500000000045
LOCATION...........: SEC 26 T 2S R17W B
FACILITY CARRIED...: HOLDEN ROAD
FEATURE INTERSECTED: HOBOLOCHITTO CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 302
STEEL STRINGER/MULTI-BEAM OR GIRDER
YEAR BUILT......................: 1963
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 135
BYPASS/DETOUR LENGTH.: 10 MI.
DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION
BRIDGE PROGRAM ELIGLBLITY: SABP
BRIDGE POSTING...........: B - Open, posting recommended but not legally implemented
H TRUCK (TONS)...................... 24
HS SHORT (TONS)..................... 32
HS LONG (TONS)...................... 38
|