This page created: 06/22/2020 07:24:48 AM                       Click here for Comprehensive Report

COUNTY: PEARL RIVER   (Supervisor District 3) DATE OF LAST INSPECTION.: 0120

STRUCTURE NUMBER...: SA5500000000083
LOCATION...........: SEC  1 T 4S R14W
FACILITY CARRIED...: MCNEIL MCHENRY RD 
FEATURE INTERSECTED: RELIEF FOR WOLF RIVER    
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 101

    CONCRETE SLAB

YEAR BUILT......................: 1970
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 400
BYPASS/DETOUR LENGTH.: 21 MI. 

DECK RATING..........: 5 - FAIR CONDITION
SUPERSTRUCTURE RATING: 5 - FAIR CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 7 - GOOD CONDITION

SUFFICIENCY RATING.......:  78.8

ELIGLBLE FOR LSBP FUNDS..: NO

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS