This page created: 11/18/2024 07:17:17 AM                       Click here for Comprehensive Report

COUNTY: PEARL RIVER   (Supervisor District 3) DATE OF LAST INSPECTION.: 0524
                      [Supervisor District 3]
STRUCTURE NUMBER...: SA550000000A083
LOCATION...........: SEC  1 T 4S R14W B
FACILITY CARRIED...: MCNEIL MCHENRY RD 
FEATURE INTERSECTED: RELIEF FOR WOLF RIVER    
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 2020
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 400
BYPASS/DETOUR LENGTH.: 21 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 7 - GOOD CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 8 - VERY GOOD CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS