This page created: 12/16/2024 07:28:00 AM                       Click here for Comprehensive Report

COUNTY: PIKE   (Supervisor District 1)        DATE OF LAST INSPECTION.: 1223
               [Supervisor District 1]
STRUCTURE NUMBER...: SA5700000000152
LOCATION...........: SEC 36 T 4N R 7E B
FACILITY CARRIED...: SUMMIT-HOLMESVILLE
FEATURE INTERSECTED: CLEAR CREEK              
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1968
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 1,500
BYPASS/DETOUR LENGTH.:  1 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 4 - POOR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 6 - SATISFACTORY CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  19
                           HS SHORT (TONS).....................  26
                           HS LONG (TONS)......................  31