|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: TISHOMINGO (Supervisor District 4) DATE OF LAST INSPECTION.: 0724
[Supervisor District 4]
STRUCTURE NUMBER...: SA710000000A051
LOCATION...........: SEC 17 T 5S R10E B
FACILITY CARRIED...: CR961 CROW NECK RD
FEATURE INTERSECTED: PANTHER CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 119
CONCRETE BOX BRIDGE
YEAR BUILT......................: 2023
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 340
BYPASS/DETOUR LENGTH.: 5 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 8 - VERY GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: G - New structure not yet open to traffic
|