|
This page created: 11/18/2024 07:17:17 AM Click here for Comprehensive Report
COUNTY: WALTHALL (Supervisor District 2) DATE OF LAST INSPECTION.: 0123
[Supervisor District 2]
STRUCTURE NUMBER...: SA740000000A044
LOCATION...........: SEC 23 T 2N R10E
FACILITY CARRIED...: PAYNE ROAD
FEATURE INTERSECTED: DRY CREEK
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 219
CONCRETE CONTINUOUS BOX BRIDGE
YEAR BUILT......................: 2018
YEAR OF REHABILITATION OR REPAIR:
AVERAGE DAILY TRAFFIC: 80
BYPASS/DETOUR LENGTH.: 3 MI.
DECK RATING..........: N - NOT APPLICABLE
SUPERSTRUCTURE RATING: N - NOT APPLICABLE
SUBSTRUCTURE RATING..: N - NOT APPLICABLE
CULVERT RATING.......: 7 - GOOD CONDITION
CHANNEL RATING.......: 7 - GOOD CONDITION
BRIDGE PROGRAM ELIGLBLITY:
BRIDGE POSTING...........: A - OPEN NO RESTRICTIONS
|