This page created: 12/16/2024 07:28:00 AM                       Click here for Comprehensive Report

COUNTY: WAYNE   (Supervisor District 3)       DATE OF LAST INSPECTION.: 0924
                [Supervisor District 3]
STRUCTURE NUMBER...: SA7700000000141
LOCATION...........: SEC 30 T10N R 7W B
FACILITY CARRIED...: W'BORO SHUBUTA RD 
FEATURE INTERSECTED: CLEAR CREEK              
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 122

    CONCRETE CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 1973
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 220
BYPASS/DETOUR LENGTH.:  7 MI. 

DECK RATING..........: 6 - SATISFACTORY CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 5 - FAIR CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 5 - FAIR CONDITION



BRIDGE PROGRAM ELIGLBLITY: SABP

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  18
                           HS SHORT (TONS).....................  24
                           HS LONG (TONS)......................  29