This page created: 07/15/2024 07:13:18 AM                       Click here for Comprehensive Report

COUNTY: WAYNE   (Supervisor District 2)       DATE OF LAST INSPECTION.: 0923
                [Supervisor District 2]
STRUCTURE NUMBER...: SA770000000A131
LOCATION...........: SEC_32_T10N_R5W  B
FACILITY CARRIED...: TOKIO FROST BR RD 
FEATURE INTERSECTED: TICK CREEK               
BRIDGE OWNER.......: 02 - COUNTY HIGHWAY AGENCY
MAIN STRUCTURE TYPE: 222

    CONCRETE CONTINUOUS CHANNEL BEAM (PRECAST UNITS)

YEAR BUILT......................: 2015
YEAR OF REHABILITATION OR REPAIR:   

AVERAGE DAILY TRAFFIC: 50
BYPASS/DETOUR LENGTH.:  8 MI. 

DECK RATING..........: 7 - GOOD CONDITION
SUPERSTRUCTURE RATING: 6 - SATISFACTORY CONDITION
SUBSTRUCTURE RATING..: 7 - GOOD CONDITION
CULVERT RATING.......: N - NOT APPLICABLE
CHANNEL RATING.......: 7 - GOOD CONDITION



BRIDGE PROGRAM ELIGLBLITY:     

BRIDGE POSTING...........: P - Posted for load
                            
                           H TRUCK (TONS)......................  23
                           HS SHORT (TONS).....................  29
                           HS LONG (TONS)......................  36